Construction · Orange County

Turnkey Residential Structure Demolition in Orange County, FL

From a tired structure to a clean, graded pad, with the utility letters and permit handled. We handle the Orange County side, from Orlando to Horizon West, with the Orange County Building Safety Division and the city offices where the parcel sits inside city limits.

$12,000 to $24,000Brightview fee
Typically 3 to 6 weeks including permit
What you receive

A cleared, rough-graded lot with a finaled demolition permit.

Residential lot
CRC13341008 Central Florida counties480 N Orlando Ave, Suite 236, Winter Park, FL 32789(407) 543-1739
Sound familiar?

Why people call us for residential demolition in Orange County

You just need the house demolished. That's the whole job.

No new house required. We pull the demolition permit, demolish the house, haul it off and grade the lot.

A code violation, an unsafe notice or a condemned house

If the city or county has ordered the structure removed, there is a deadline. When owners don't act, many local governments can demolish it themselves and charge the cost to the property, often as a lien. Hiring a licensed contractor first keeps you in control of the price and the schedule. Bring us the notice and we'll work to its deadline.

Fire or storm damage

What's left after a fire or a storm, made safe, permitted and cleared.

You're selling the land, not the house

Some buyers want a clean lot, not a teardown. We clear it so they see the land.

Orange County specifics

What matters for this in Orange County

A demolition permit in Orange County needs the utility disconnect letters and the asbestos notice in hand; EPD also looks at tree removal on the lot, which is easy to trip over on an older, wooded parcel.

Orange County parcels carry overlays a quick zoning lookup misses: the Wekiva Study Area in the northwest, the Econlockhatchee River protection corridor in the east, and Rural Settlement boundaries that cap density regardless of the zoning district. The Environmental Protection Division (EPD) conservation-area and tree rules decide how much of a wooded lot is actually buildable.

Want the jurisdiction and flood zone first? Run a free property snapshot.

Planning & zoning

Orange County Planning Division

Building permits

Orange County Building Safety Division (cities issue their own)

Water management

St. Johns River Water Management District (SJRWMD); South Florida Water Management District (SFWMD) in the south of the county

Water & sewer

Orange County Utilities, OUC inside Orlando, and city systems in Winter Garden, Ocoee and Apopka

Demolition permit guides

Inside a city? Each one runs its own permit.

If the house is inside city limits, the city building department issues the demolition permit, not Orange County. Pick the city for its steps, documents and historic rules, verified 2026-10-12 from official sources.

Outside city limits

Unincorporated Orange County

In unincorporated Orange County, residential demolition permits are issued by the Orange County Division of Building Safety (application: Application for Building/Land Use Permit, Page 1 and Page 2 (Page 2 notarized), emailed to EResQuestions@ocfl.net. Demolition permits are not available on Fast Track.).

The process

Demolition permit steps in Unincorporated Orange County

  1. Step 1

    Complete Page 1 (describe it as a demolition, structure type, height, square footage, whether court-ordered, total job value) and Page 2 (signed and notarized).

  2. Step 2

    Email the application, site plan or aerial, and disconnect letters to EResQuestions@ocfl.net.

  3. Step 3

    If the permit requires a Health Review, contact the Health Department.

  4. Step 4

    The county emails an approval or non-approval notice; status is visible on Fast Track.

  5. Step 5

    Pay the invoice online through a Fast Track account.

  6. Step 6

    Pass required inspections, including the 290 Final Inspection, or the permit expires.

What to submit

Documents Unincorporated Orange County asks for

DocumentWhat it is
Application for Building/Land Use Permit, Page 1Fully completed and signed. [1]
Application Page 2Completed, signed and notarized. [1]
Site plan or aerial photoShows where the structure sits on the property. [1]
Utility service disconnect lettersFor a house or mobile home (electric, gas, etc.). For a pool, spa or freestanding garage, a signed, notarized letter from a Florida-licensed electrical contractor registered with Orange County stating power is disconnected. If no utilities are attached, say so on the application. [1]
Owner-builder ownership verificationVideo meeting via OwnerVerification@ocfl.net. [1]
Certification of Service Disconnect formOlder county packet (rev. 2018): telephone, gas, electric, cable, water and other (LPG) companies certify service is removed or sealed and plugged before demolition. [2]
Before the machine shows up

Utilities, asbestos, septic and trees in Unincorporated Orange County

Utilities
  • Electric, gas, telephone, cable, water and LPG providers serving the site: Disconnect letters or Certification of Service Disconnect sign-offs before the permit. [1]
Asbestos

Orange County Environmental Protection Division (local FDEP asbestos program): Orange County is one of eight FDEP local asbestos programs. County EPD guidance: essentially all buildings are subject to the asbestos NESHAP except some single-family residences; single-family homes that will be burned, were used as a business, or are part of a larger project with other houses or businesses on the same site are subject. Call EPD at 407-836-1400 before relying on the residential building exemption. Subject buildings must be thoroughly inspected (generally a survey by a Florida licensed asbestos consultant), a Notice of Demolition or Asbestos Renovation is required even if no asbestos is found, RACM must be abated by a licensed asbestos contractor before demolition, and notices are due at least 10 working days before work starts. see the Florida rules on our residential demolition page for the state rule. [2]

Septic and well

Florida Department of Health in Orange County (environmental health), per county forms: County pre-demolition form: if there is a septic tank it must be filled or removed; contact the Health Department before demolition for septic filling and removal requirements. The current residential page says to contact the Health Department (1001 Executive Center Drive, Suite 200, Orlando, 407-858-1497 ext. 5228) when a Health Review is required. State abandonment rule: see the Florida rules on our residential demolition page. [1]

Trees

Tree removal permits are handled by the Zoning Division Arbor Office (407-836-5807, Arborist@ocfl.net) through Fast Track. A permit is needed unless an exception under Orange County Code s. 15-279(a) applies; a lot with an approved single-family or duplex building permit may remove trees for the pad, driveway, septic and 15 feet around the pad under that building permit. Removals in wetlands, conservation or wildlife areas are not authorized by zoning approval. [3]

After the house is down
  • Pass the 290 Final Inspection so the permit shows complete; failing to do so within the allowed time causes the permit to expire.
  • For a pool, a passed 310 Demolition Inspection verifies drain holes in the pool shell base.
Good to know
  • A full-text search of the Orange County Code on Municode (Supp. 129, Sept. 16, 2026) for historic preservation found no historic preservation board or demolition review ordinance for unincorporated Orange County; hits were rural Preservation Districts under Charter s. 505 (land use) and floodplain variances for historic buildings.
Where to file

The office that issues it

Orange County Division of Building Safety

Orange County Administration Building, 201 South Rosalind Avenue, 1st Floor, Orlando, FL 32801

407-836-5550

Department website

Fast Track Online Services (payment only; demolition applications are emailed)

Demolition application

Who may apply: A licensed contractor, or an owner-builder under the s. 489.103(7)(a), F.S. exemption. Owner-builders must email OwnerVerification@ocfl.net to schedule a video meeting to verify ownership.

Sources · verified 2026-10-12

Where this comes from

Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.

  1. Residential Demolition Permit, Orange County
    https://www.ocfl.net/PermitsLicenses/Permits/ResidentialDemolitionPermit.aspx
  2. Pre-Demolition Packet with EPD Demolition and Asbestos Renovation Guidance (rev. 09/12/18)
    https://ocfl.net/Portals/0/resource library/permits - licenses/Pre Demolition Packet-CERT.pdf
  3. Tree Removal Permit, Orange County
    https://www.ocfl.net/PermitsLicenses/Permits/TreeRemovalPermit.aspx
  4. Orange County Code of Ordinances, Municode
    https://library.municode.com/fl/orange_county/codes/code_of_ordinances
  5. http://www.orangecountyfl.net/Portals/0/resource%20library/permits%20-%20licenses/Building%20Permit-CERT.pdf
    http://www.orangecountyfl.net/Portals/0/resource%20library/permits%20-%20licenses/Building%20Permit-CERT.pdf
  6. https://fasttrack.ocfl.net/OnlineServices/
    https://fasttrack.ocfl.net/OnlineServices/

What we could not confirm in published sources

Ask the building department about these before you plan around them.

  • Demolition permit fee (county fee directory not read).
  • Review time not published.
  • Health Department extension conflict: residential page says ext. 5228; the 2018 pre-demolition form says ext. 2282 or 2289.
  • EPD address conflict: 2018 county guidance gives 800 Mercy Drive, Suite 4; Winter Garden's 2026 demolition page gives Orange County EPD at 3165 McCrory Place, Suite 200, Orlando 32803.
  • Whether the 2018 pre-demolition inspection packet is still in use for residential work.
  • Confirm with county planning that no historic designation applies anywhere in unincorporated Orange.
How it works in Orange County

7 steps, start to finish

  1. Site walk and quote

    We look at the house, the lot and the access, and price it.

  2. Asbestos survey and notice

    Survey before demolition and the state notice filed ahead of work.

  3. Utilities off

    Electric, gas and water disconnected and capped, with the letters the permit needs.

  4. Historic review if it applies

    In a historic district the board may want photos, history and proof you tried to save the house.

  5. Permit issued

    Pulled under our Florida contractor license.

  6. Down, out and graded

    Tear-down, haul-off, rough grade and silt fence.

  7. Closed out

    Final inspection, then the property appraiser is told the house is gone.

What's included

The scope, in writing

  • Demolition permit pulled under our Florida contractor license (CRC1334100)
  • Asbestos survey coordination and NESHAP notification
  • Electric, water and gas safe-capping and disconnect letters
  • Mechanical tear-down and complete debris haul-off
  • Rough site grading and silt fence installation
  • Property appraiser notice so the parcel is reassessed as vacant land
DELIVERABLE

What you receive

A cleared, rough-graded lot with a finaled demolition permit.

Build your quote

Your scope and estimated fee

Add-ons are optional. Third-party costs are never on this receipt: those are quoted first and paid directly to the provider.

Residential Demolition$12,000 to $24,000
Pairs well with
100%OF OUR FEES, CREDITED

Every dollar you pay us comes back when we build.

When you build your home, ADU or garage with Brightview Homes, every dollar you paid Brightview for due diligence, entitlements and demolition coordination is credited back against your construction agreement. Pre-construction fees are credited in full against the construction contract price at signing.

  1. Applies to full-cycle building agreements (a home on your lot or custom home, a turnkey ADU, or a custom detached multi-car garage or workshop) with a contract value of $100,000 or more.
  2. Fees are earned as each filing, audit or field visit is completed and are not refundable. The credit is applied against the final construction draw or the pre-construction contract balance, never paid out in cash.
  3. Credits stay valid for 12 months from delivery of the completed work or permit closeout.

The credit covers Brightview's fees. Surveyor, engineer, attorney and government fees are paid directly to those providers and are not part of the credit.

Questions people actually ask

Straight answers

How much does a Residential Demolition cost in Orange County?

It is quoted per job; most run $12,000 to $24,000 depending on square footage and material. Prices shown are Brightview's fee. Surveyor, engineer, attorney and government fees are quoted in writing before anything is ordered and paid by you directly to the provider, never marked up. If you go on to build with us, Brightview's fee is credited toward the construction agreement under the build-credit terms.

Who approves a Residential Demolition in Orange County?

The Orange County Building Safety Division (or the city building department) issues the demolition permit; the asbestos notice goes to the Florida DEP or its delegated local program.

How long does it take in Orange County?

Typically 3 to 6 weeks including permit. The proposal gives a schedule for your parcel before you commit.

Is any of this free?

The property snapshot is free because it only reads public records. Every service on this menu is a paid, defined scope, and Brightview's fees are credited toward the construction agreement if you build with us.

Start here

Get this scope quoted in Orange County

Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.

Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.

Selected scope
  • Residential Demolition
What is the plan? *