Lot Splits, Rezoning & Entitlements · Orange County

Commercial Outparcel Carve-Outs & Site Development Plans (SDP) in Orange County, FL

Carve a pad out of a commercial parent parcel and get it to an approved site plan. We handle the Orange County side, from Orlando to Horizon West, with the Orange County Planning Division and the city offices where the parcel sits inside city limits.

$9,500 to $18,500Brightview fee
Typically 4 to 9 months
What you receive

A separate outparcel with an approved site development plan.

Residential lot
CRC13341008 Central Florida counties480 N Orlando Ave, Suite 236, Winter Park, FL 32789(407) 543-1739
Sound familiar?

Why people call us for commercial outparcels & sdp in Orange County

You own a center and want to sell or lease a pad

We carve the outparcel out and get it to an approved site plan.

Orange County specifics

What matters for this in Orange County

Horizon West is a Special Planning Area built out through village Planned Developments, and school capacity is reviewed before plats move. The DRC is where engineering, transportation and EPD comments get resolved before anything goes to a hearing.

Orange County parcels carry overlays a quick zoning lookup misses: the Wekiva Study Area in the northwest, the Econlockhatchee River protection corridor in the east, and Rural Settlement boundaries that cap density regardless of the zoning district. The Environmental Protection Division (EPD) conservation-area and tree rules decide how much of a wooded lot is actually buildable.

Want the jurisdiction and flood zone first? Run a free property snapshot.

Planning & zoning

Orange County Planning Division

Building permits

Orange County Building Safety Division (cities issue their own)

Water management

St. Johns River Water Management District (SJRWMD); South Florida Water Management District (SFWMD) in the south of the county

Water & sewer

Orange County Utilities, OUC inside Orlando, and city systems in Winter Garden, Ocoee and Apopka

How it works in Orange County

4 steps, start to finish

  1. Parent parcel review

    Master stormwater, access and parking rules for the whole center.

  2. Easements laid out

    Cross access and shared parking, drafted by your attorney from our layout.

  3. Driveway access

    FDOT or county connection permits.

  4. Site plan approval

    Administrative site development plan, approved.

What's included

The scope, in writing

  • Commercial parent parcel carve-outs
  • Cross-access and reciprocal parking easement coordination
  • Master stormwater capacity allocation
  • FDOT and county driveway access permitting
  • Administrative Site Development Plan (SDP) approval
DELIVERABLE

What you receive

A separate outparcel with an approved site development plan.

Build your quote

Your scope and estimated fee

Add-ons are optional. Third-party costs are never on this receipt: those are quoted first and paid directly to the provider.

Commercial Outparcels & SDP$9,500 to $18,500
Pairs well with
100%OF OUR FEES, CREDITED

Every dollar you pay us comes back when we build.

When you build your home, ADU or garage with Brightview Homes, every dollar you paid Brightview for due diligence, entitlements and demolition coordination is credited back against your construction agreement. Pre-construction fees are credited in full against the construction contract price at signing.

  1. Applies to full-cycle building agreements (a home on your lot or custom home, a turnkey ADU, or a custom detached multi-car garage or workshop) with a contract value of $100,000 or more.
  2. Fees are earned as each filing, audit or field visit is completed and are not refundable. The credit is applied against the final construction draw or the pre-construction contract balance, never paid out in cash.
  3. Credits stay valid for 12 months from delivery of the completed work or permit closeout.

The credit covers Brightview's fees. Surveyor, engineer, attorney and government fees are paid directly to those providers and are not part of the credit.

Questions people actually ask

Straight answers

How much does a Commercial Outparcels & SDP cost in Orange County?

Brightview's fee runs $9,500 to $18,500, depending on scope. Prices shown are Brightview's fee. Surveyor, engineer, attorney and government fees are quoted in writing before anything is ordered and paid by you directly to the provider, never marked up. If you go on to build with us, Brightview's fee is credited toward the construction agreement under the build-credit terms.

Who approves a Commercial Outparcels & SDP in Orange County?

The Orange County Development Review Committee (DRC) coordinates the review, with the St. Johns River Water Management District (SJRWMD) and the South Florida Water Management District (SFWMD) in the south of the county handling stormwater permitting.

How long does it take in Orange County?

Typically 4 to 9 months. The proposal gives a schedule for your parcel before you commit.

Is any of this free?

The property snapshot is free because it only reads public records. Every service on this menu is a paid, defined scope, and Brightview's fees are credited toward the construction agreement if you build with us.

Start here

Get this scope quoted in Orange County

Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.

Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.

Selected scope
  • Commercial Outparcels & SDP
What is the plan? *