Brightview demolition in progress

Seminole County, Florida

Demolition and clearing
in Seminole County.

House teardowns, land clearing and concrete work across Seminole County. We are a licensed Florida building contractor, so the permit file is ours to run, not yours to chase.

Brightview Construction Group, LLC · Florida certified residential contractor CRC 1334100

Demolition and site work in Seminole County

We work the unincorporated county and the cities inside it: Sanford, Oviedo, Lake Mary, Longwood, Altamonte Springs, Winter Springs, Casselberry.

What we take down

House teardowns and everything else on the lot. Clean concrete and block get separated from the mixed debris, which holds the disposal cost down, and the lot is backfilled and graded before we leave.

  • Full house teardown, slab or crawlspace
  • Garages, sheds and outbuildings
  • Mobile and manufactured homes
  • Driveways, slabs and foundations
  • Pools, demo or engineered fill
  • Lot clearing, tree felling and haul-off

House demolition Driveway replacement Land clearing

Demolition permits in Seminole County

Permitting is where residential demolition actually stalls, and every city inside the county runs its own building department with its own forms and its own clock. Here is where each one submits. We pull these ourselves on jobs where we are the contractor of record.

JurisdictionDepartmentWhere it submitsPublished turnaroundNOC threshold
Seminole County (unincorporated)Seminole County Building Division (Development Services)ePlan (ProjectDox) for plan and document upload; Building Permits Online (Click2Gov, https://semc-egov.aspgov.com/Click2GovBP/index.html) to request the application number, schedule inspections and see feesNo demolition-specific time. The Building page gives estimates for a new residential…Not published
City of Altamonte SpringsCity of Altamonte Springs Building and Fire Safety DepartmentCivic Access (Tyler EnerGov Self Service)Not published$5,000 (non-mechanical work; per 2024 permit checklist search snippet)
City of CasselberryCity of Casselberry Building Division (Community Development)CitizenserveNot publishedNot published
City of Lake MaryCity of Lake Mary Building Division (Community Development)ePlanSoft GoPost online permit portalNot publishedNot published
City of LongwoodCity of Longwood Building Division (Community Development)SmartGovNot publishedNot published
City of OviedoCity of Oviedo Building ServicesClick2Gov (applications/payments) plus ePlanSoft GoPost electronic plan review (https://gopost-oviedo.eplansoftreview.com/#/login?portal=oviedo)Not publishedNot published
City of SanfordCity of Sanford Building Division (Development Services)Citizenserve (all building permitting; no paper applications)Not publishedNot published
City of Winter SpringsCity of Winter Springs Building Division (Community Development)Civic Access Portal (Tyler EnerGov)Not publishedNot published

Checked against official county and city pages on 2026-10-13. Fees and turnaround change without notice, so confirm with the building department before relying on any line of this. We publish it because nobody else does, not as a substitute for the county.

Historic review in Seminole County

A structure inside a historic district or overlay cannot be permitted for demolition on the building permit alone. It goes to a review board first, and that board meets on its own calendar. This is the most common reason a teardown slips a month.

  • City of Sanford. Reviewed by the Sanford Historic Preservation Board (HPB). A COA is required for exterior work on landmarks and in the Downtown Commercial, Sanford Avenue and Residential Historic Districts, and for demolition in the Georgetown Residential Historic District. If demolition is approved, a mandatory 180-day waiting…
  • City of Lake Mary. Reviewed by the Lake Mary Historical Commission (Code Secs. 30.80-30.85). The Commission exists (7 members, meets every other month), but no demolition review authority was verified.
  • City of Longwood. Longwood Historic District: about 190 acres, 37 contributing structures, National Register listed Oct 1990. The demolition application says the city may require a historic-specialist architect review at the applicant's cost. No board or COA requirement for…

What is required on nearly every job

  • Notice of commencement, recorded, not just signed
  • Owner authorization to permit, notarized
  • Survey or site plan marking the structure
  • Asbestos survey and the FDEP notice, at least 10 working days before demolition
  • Utility disconnect letters for electric, gas and water or sewer
  • Septic abandonment through the Health Department where the lot is on septic

Permitting, asbestos abatement, septic and well abandonment and tree mitigation are quoted separately or handled by others. That is printed on every proposal rather than turning up later as a change order.

Get a bid

Send the address and a few photos and you will get a written scope back with the price and the exclusions on it. If the date is the problem, say so up front. That is usually the part we can fix.