Brightview demolition in progress

Osceola County, Florida

Demolition and clearing
in Osceola County.

House teardowns, land clearing and concrete work across Osceola County. We are a licensed Florida building contractor, so the permit file is ours to run, not yours to chase.

Brightview Construction Group, LLC · Florida certified residential contractor CRC 1334100

Demolition and site work in Osceola County

We work the unincorporated county and the cities inside it: Kissimmee, St. Cloud.

What we take down

House teardowns and everything else on the lot. Clean concrete and block get separated from the mixed debris, which holds the disposal cost down, and the lot is backfilled and graded before we leave.

  • Full house teardown, slab or crawlspace
  • Garages, sheds and outbuildings
  • Mobile and manufactured homes
  • Driveways, slabs and foundations
  • Pools, demo or engineered fill
  • Lot clearing, tree felling and haul-off

House demolition Driveway replacement Land clearing

Demolition permits in Osceola County

Permitting is where residential demolition actually stalls, and every city inside the county runs its own building department with its own forms and its own clock. Here is where each one submits. We pull these ourselves on jobs where we are the contractor of record.

JurisdictionDepartmentWhere it submitsPublished turnaroundNOC threshold
Osceola County (unincorporated)Osceola County Building & Permitting Office (Community Development)Osceola County Permit Center (permits.osceola.org; the City of Kissimmee site links to it under an 'accela' path, so likely Accela, not confirmed on the county page)Residential permits usually 3 to 5 business days (general residential review; not…$5,000 or more (labor and materials), per the Osceola County Building Office FAQ
City of KissimmeeCity of Kissimmee Development ServicesCitizen Self-Service Portal (Tyler EnerGov)Not publishedNot published
City of St. CloudCity of St. Cloud Building DepartmentSt. Cloud Online Permit Application Submittals (city FormCenter); status, inspections and payment at Building Permit Portal https://stcloudflpermits.selectpaytoday.com/Not published$5,000.00 or more (per the city's online Demolition Permit Application)

Checked against official county and city pages on 2026-10-13. Fees and turnaround change without notice, so confirm with the building department before relying on any line of this. We publish it because nobody else does, not as a substitute for the county.

Historic review in Osceola County

A structure inside a historic district or overlay cannot be permitted for demolition on the building permit alone. It goes to a review board first, and that board meets on its own calendar. This is the most common reason a teardown slips a month.

  • City of Kissimmee. Reviewed by the Kissimmee Historic Preservation Board. Kissimmee LDC (Municode Ch. 14-3) gives the Historic Preservation Board powers over Historic Preservation Overlay districts and landmarks, with major and minor Certificates of Appropriateness (sec. 14-3-37). Development Services staffs the board. A Kissimmee…
  • City of St. Cloud. Reviewed by the St. Cloud Historic Preservation Board (HPB). Ordinance 2016-55 created the Historic Preservation Overlay District and the HPB, which meets about monthly (no July or December meetings). District boundary map: https://www.stcloudfl.gov/DocumentCenter/View/32159/Historic-Preservation-District-Boundary-Map.…

What is required on nearly every job

  • Notice of commencement, recorded, not just signed
  • Owner authorization to permit, notarized
  • Survey or site plan marking the structure
  • Asbestos survey and the FDEP notice, at least 10 working days before demolition
  • Utility disconnect letters for electric, gas and water or sewer
  • Septic abandonment through the Health Department where the lot is on septic

Permitting, asbestos abatement, septic and well abandonment and tree mitigation are quoted separately or handled by others. That is printed on every proposal rather than turning up later as a change order.

Get a bid

Send the address and a few photos and you will get a written scope back with the price and the exclusions on it. If the date is the problem, say so up front. That is usually the part we can fix.

Subcontractors
subs@brightviewcg.com

Careers
careers@brightviewcg.com