Brightview demolition in progress

Brevard County, Florida

Demolition and clearing
in Brevard County.

House teardowns, land clearing and concrete work across Brevard County. We are a licensed Florida building contractor, so the permit file is ours to run, not yours to chase.

Brightview Construction Group, LLC · Florida certified residential contractor CRC 1334100

Demolition and site work in Brevard County

We work the unincorporated county and the cities inside it: Melbourne, Palm Bay, Titusville, Cocoa.

What we take down

House teardowns and everything else on the lot. Clean concrete and block get separated from the mixed debris, which holds the disposal cost down, and the lot is backfilled and graded before we leave.

  • Full house teardown, slab or crawlspace
  • Garages, sheds and outbuildings
  • Mobile and manufactured homes
  • Driveways, slabs and foundations
  • Pools, demo or engineered fill
  • Lot clearing, tree felling and haul-off

House demolition Driveway replacement Land clearing

Demolition permits in Brevard County

Permitting is where residential demolition actually stalls, and every city inside the county runs its own building department with its own forms and its own clock. Here is where each one submits. We pull these ourselves on jobs where we are the contractor of record.

JurisdictionDepartmentWhere it submitsPublished turnaroundNOC threshold
Brevard County (unincorporated)Brevard County Planning and Development DepartmentEmail or counter submittalNot published$5,000 (job value over $5,000, per the Residential Demolition page)
City of CocoaCity of Cocoa Building and Permitting DivisionCitizenserveNot publishedNot published
City of MelbourneCity of Melbourne Code Compliance DivisionEnerGov (Tyler) self-service portalNot publishedNot published
City of Palm BayCity of Palm Bay Building Department (Permits/Inspections)Email or counter submittalResidential permits: average 14 working days for approval or response (Building Permits FAQ;…$5,000
City of TitusvilleCity of Titusville Building Department (Community…BS&A OnlineNot publishedNot published

Checked against official county and city pages on 2026-10-13. Fees and turnaround change without notice, so confirm with the building department before relying on any line of this. We publish it because nobody else does, not as a substitute for the county.

Historic review in Brevard County

A structure inside a historic district or overlay cannot be permitted for demolition on the building permit alone. It goes to a review board first, and that board meets on its own calendar. This is the most common reason a teardown slips a month.

  • City of Melbourne. Reviewed by the Historic and Architectural Review Board (HARB) / Historic Preservation Officer. Eau Gallie Historic District plus individually designated properties. A Certificate of Appropriateness (no cost) is required before a building permit for permitted exterior work on designated properties. The page does not say whether demolition triggers a CoA…
  • City of Titusville. Reviewed by the Historic Preservation Board. Code Section 29-119 requires a Certificate of Appropriateness to demolish a designated historic resource. Per an official search result, the CoA application needs notarized signatures from all property owners and a narrative explaining why no feasible…

What is required on nearly every job

  • Notice of commencement, recorded, not just signed
  • Owner authorization to permit, notarized
  • Survey or site plan marking the structure
  • Asbestos survey and the FDEP notice, at least 10 working days before demolition
  • Utility disconnect letters for electric, gas and water or sewer
  • Septic abandonment through the Health Department where the lot is on septic

Permitting, asbestos abatement, septic and well abandonment and tree mitigation are quoted separately or handled by others. That is printed on every proposal rather than turning up later as a change order.

Get a bid

Send the address and a few photos and you will get a written scope back with the price and the exclusions on it. If the date is the problem, say so up front. That is usually the part we can fix.

Subcontractors
subs@brightviewcg.com

Careers
careers@brightviewcg.com