Demolition permit guide · Osceola County

How to demolish a house in St. Cloud, FL

In St. Cloud, residential demolition permits are issued by the City of St. Cloud Building Department (application: Demolition Permit Application (class of work: Partial, Entire or Relocation)). If the house is a designated landmark or sits in a local historic district, review by the St. Cloud Historic Preservation Board (HPB) comes first.

Verified 2026-10-12 from 12 official sourcesHistoric review applies to some houses
Residential lot
CRC13341008 Central Florida counties480 N Orlando Ave, Suite 236, Winter Park, FL 32789(407) 543-1739
The process

Demolition permit steps in St. Cloud

  1. Step 1

    If the property is in the Historic Preservation District, get a Certificate of Appropriateness for demolition (and for new construction) from the Historic Preservation Board first.

  2. Step 2

    Complete the Demolition Sign-Off Sheet. All utility sign-offs must be completed before the demolition permit is issued; the applicant obtains signatures from Spectrum (cable), Central Florida Gas, fiber optic (as determined by the owner), OUC or KUA (electric), and Toho Water (water and sewer).

  3. Step 3

    City sign-offs on the same sheet: Building Department, Concurrency Planning, Public Service Engineering (Public Works), Fire Department, and 911 Addressing (Osceola Sheriff).

  4. Step 4

    File the FDEP Notice of Demolition or Asbestos Renovation (DEP Form 62-257.900(1)), which is included in the city packet.

  5. Step 5

    Submit the notarized application, sign-off packet and supporting documents (20 MB upload limit).

  6. Step 6

    Record a Notice of Commencement at the Osceola County Courthouse for projects valued at $5,000 or more (materials plus labor).

  7. Step 7

    Do not begin demolition until the permit is issued.

What to submit

Documents St. Cloud asks for

DocumentWhat it is
Notarized Demolition Permit Application [1]
Demolition Sign-Off Sheet (completed)Utility and city department signatures; asks disconnection date, whether a rebuild is planned within 90 days, utilities to be disconnected and number of buildings. [2]
Notice of Commencement$5,000 or more; recorded at the Osceola County Courthouse. [1]
DEP Asbestos FormDEP Form 62-257.900(1). [1]
Owner/Builder Disclosure FormIf the residential owner is acting as contractor. [1]
Owner AuthorizationLeased residential (or an executed contract); Commercial Owner/Landlord Authorization for leased commercial. [1]
Historic houses

If the house is historic in St. Cloud

Who reviews it: St. Cloud Historic Preservation Board (HPB).

When it applies

  • Any permit in the Historic Preservation District requires a Certificate of Appropriateness (city boundary map).
  • LDC Sec. 3.24.7: the HPB or planning and zoning staff review actions affecting the exterior of all properties in the district, including noncontributing properties; demolition is a major work item for the HPB.
  • Staff, the building official or other city staff may start or recommend designation of an undesignated property proposed for demolition.

How the review works

  • No building in the district may be demolished without first receiving a certificate of appropriateness for new construction; demolition and new construction applications are reviewed together by the HPB and Planning and Zoning (LDC 3.24.7.B.3.i). The HPB may waive the new construction requirement on good cause such as age, infirmity, disability or financial hardship.
  • After HPB approval, the demolition permit is not issued until all demolition and new construction plans have received all other required governmental approvals (3.24.7.B.3.iv).
  • The HPB may deny demolition if the resource contributes significantly to the district, is on the National Register, is one of the last of its kind, can be repaired and reused practically, has study value, would be an irreparable loss, or the replacement plans are incompatible (3.24.7.B.3.v).
  • While a designation for an undesignated property is considered, issuance of the demolition permit may be stayed up to 120 days unless City Council extends it (3.24.7.B.6).
  • COA applications are filed separately from the building permit with Planning and Zoning (407-957-7255) with the application fee from the fee schedule.

What the board can ask for

  • If demolition is approved, the owner must fully record the building at the owner's expense before demolition: at minimum an architectural description, a floor plan with interior and exterior dimensions, interior and exterior photographs, and anything else the HPB requests; the record is deposited with the city clerk and made public (3.24.7.B.3.iii).
  • COA checklist: completed application, survey (if applicable), 2 copies of scaled color elevation drawings of each affected side showing existing and proposed, notarized Agent Authorization Form, materials list or spec sheets, photographs of the existing structure, narrative, and the application fee (Revised September 2021).

Demolition delay: The HPB may approve demolition with a delayed effective date of up to three months, during which it may consult community groups and agencies, recommend acquisition, or explore moving the building (3.24.7.B.4). Separately, a stay of up to 120 days applies while designation of an undesignated property is considered (3.24.7.B.6).

Relocation, salvage and donation: The HPB may require the owner to salvage and preserve specified classes of building materials, architectural details, ornaments and fixtures (3.24.7.B.5). Relocation may be denied if it would cause substantial loss to the setting, the vacated area has no or harmful plans, the building cannot be moved without significant damage, the new site is incompatible, or little effort was made to relocate within a compatible district (3.24.7.B.7).

Historic district map and list

Sources: [4], [5], [6]

Before the machine shows up

Utilities, asbestos, septic and trees in St. Cloud

Utilities
  • Spectrum (cable/TV): Signature required on the city Demolition Sign-Off Sheet before permit issuance. [2]
  • Central Florida Gas: Signature required on the Sign-Off Sheet (engineering contact listed on the sheet). [2]
  • OUC or KUA (electric): Signature required on the Sign-Off Sheet. The packet includes OUC's Demolition Request form: OUC will not proceed until Development Services (407-423-9018) is contacted to turn off services; provide all electric and water meter numbers; the word DEMO must be painted on the building visible from the street; allow at least 20 working days. [2]
  • Toho Water Authority (water and sewer): Signature required on the Sign-Off Sheet; contact listed as MeterFees@tohowater.com. [2]
  • Fiber optic provider: Signature required; provider determined by the owner. [2]
Asbestos

Florida Department of Environmental Protection, Central District (no delegated local program): No local asbestos program covers this county; FDEP Central District (main line 407-897-4100) receives the Notice of Renovation or Demolition (DEP Form 62-257.900(1), Notice of Demolition or Asbestos Renovation) at least 10 working days before the project start date for projects removing asbestos above the NESHAP thresholds. FDEP lists a $200 flat fee for hard copy or Pay Later notices and a $100 fee when paid through the DEP Business Portal Pay Now feature (effective March 23, 2025). FDEP says buildings meeting the residential exemption criteria in the Asbestos NESHAP are excluded from the work practice requirements; check 40 CFR Part 61 Subpart M for whether a given house qualifies. St. Cloud lists the DEP asbestos form as a required demolition document and includes it in the sign-off packet. [9]

Septic and well

Florida Department of Health in Osceola County, Environmental Public Health: Septic permitting in Osceola is still handled by the county health department, not FDEP (FDEP county list). The Osceola fee, form and checklist for a septic abandonment tied to a demolition were not found on an official page read for this research. [10]

Good to know
  • LDC Sec. 3.24.7 text is reproduced in the city's COA packet (Ord. No. 2016-55, Sec. 1, 12-8-2016).
  • Effective January 1, 2025 the city no longer accepts cash payments†.
  • The Sign-Off Sheet notes that utilities with an asterisk must be signed by the applicant and contact names are listed for convenience.
Where to file

The office that issues it

City of St. Cloud Building Department

1300 Ninth Street, St. Cloud, FL 34769

407-957-7224

Department website

City online permit application (Form Center) and eTRAKiT permit portal

Demolition application

Who may apply: Licensed contractor or residential owner acting as contractor with the Owner/Builder Disclosure Form; for leased residential property, an owner authorization or executed contract.

Florida rules

State rules apply on top of the local ones

The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.

Questions people actually ask

Straight answers

Do I need a permit to demolish a house in St. Cloud?

Yes. Residential demolition in St. Cloud is permitted through the City of St. Cloud Building Department.

Who can pull a demolition permit in St. Cloud?

Licensed contractor or residential owner acting as contractor with the Owner/Builder Disclosure Form; for leased residential property, an owner authorization or executed contract.

What if my house is historic in St. Cloud?

If the house is a local landmark or in a local historic district, St. Cloud Historic Preservation Board (HPB) reviews the demolition before a permit can issue. The HPB may approve demolition with a delayed effective date of up to three months, during which it may consult community groups and agencies, recommend acquisition, or explore moving the building (3.24.7.B.4). Separately, a stay of up to 120 days applies while designation of an undesignated property is considered (3.24.7.B.6).

Do I need an asbestos survey to demolish a house in St. Cloud?

No local asbestos program covers this county; FDEP Central District (main line 407-897-4100) receives the Notice of Renovation or Demolition (DEP Form 62-257.900(1), Notice of Demolition or Asbestos Renovation) at least 10 working days before the project start date for projects removing asbestos above the NESHAP thresholds. FDEP lists a $200 flat fee for hard copy or Pay Later notices and a $100 fee when paid through the DEP Business Portal Pay Now feature (effective March 23, 2025). FDEP says buildings meeting the residential exemption criteria in the Asbestos NESHAP are excluded from the work practice requirements; check 40 CFR Part 61 Subpart M for whether a given house qualifies. St. Cloud lists the DEP asbestos form as a required demolition document and includes it in the sign-off packet.

Can Brightview handle the demolition in St. Cloud?

Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.

Sources · verified 2026-10-12

Where this comes from

Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.

  1. St. Cloud Demolition Permit Application (Form Center)
    https://www.stcloudfl.gov/FormCenter/Building-Permit-Applications-3/Demolition-Permit-Application-PDF-74
  2. St. Cloud Demolition Sign-Off Sheet packet (includes OUC Demolition Request and FDEP Form 62-257.900(1))
    https://www.stcloudfl.gov/DocumentCenter/View/30367/Demolition-Sign-Off-Sheet---Complete-FILLABLE
  3. St. Cloud Applications and Form Downloads
    https://stcloudfl.gov/1959/Applications-Form-Downloads
  4. St. Cloud Historic Preservation Certificate of Appropriateness Packet (Revised September 2021)
    https://www.stcloudfl.gov/DocumentCenter/View/32815/Historic-Preservation-Certificate-of-Appropriateness-Packet
  5. St. Cloud Historic Preservation District Boundary Map
    https://www.stcloudfl.gov/DocumentCenter/View/32159/Historic-Preservation-District-Boundary-Map
  6. St. Cloud Online Permit Application Submittals †
    https://fl-stcloud2.civicplus.com/1652/Online-Permit-Application-Submittals
  7. FDEP Asbestos program page (Central District coverage, 10 working day notice, fees)
    https://floridadep.gov/air/permitting-compliance/content/asbestos
  8. FDEP Onsite Sewage FAQ, Permitting (which counties DOH still permits)
    https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting
  9. https://floridadep.gov/air/permitting-compliance/content/asbestos ; https://www.stcloudfl.gov/FormCenter/Building-Permit-Applications-3/Demolition-Permit-Application-PDF-74
    https://floridadep.gov/air/permitting-compliance/content/asbestos ; https://www.stcloudfl.gov/FormCenter/Building-Permit-Applications-3/Demolition-Permit-Application-PDF-74
  10. https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting ; https://osceola.floridahealth.gov/programs-and-services/environmental-health/onsite-sewage-disposal/
    https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting ; https://osceola.floridahealth.gov/programs-and-services/environmental-health/onsite-sewage-disposal/
  11. https://www.stcloudfl.gov/50/Permit-Information
    https://www.stcloudfl.gov/50/Permit-Information
  12. https://etrakit.stcloud.org/etrakit/
    https://etrakit.stcloud.org/etrakit/

† Read from a search engine's copy of the official page because the government site blocked direct access during our research. Treat these items as unconfirmed and check them with the office.

What we could not confirm in published sources

Ask the building department about these before you plan around them.

  • Demolition permit fee (a third-party site lists $157.59; not confirmed on an official source).
  • COA application fee amount (packet says see fee schedule).
  • Whether demolition in the district can ever be handled at staff level (packet shows Ordinary, Minor (staff) and Major (HPB) review types without saying demolition is always Major).
  • HPB meeting schedule and submittal deadline.
  • Office location detail differs among sources (1300 9th Street Atrium 2nd floor vs Building A 1st floor).
Start here

Get this scope quoted in Osceola County

Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.