How to demolish a house in Cocoa Beach, FL
In Cocoa Beach, residential demolition permits are issued by the City of Cocoa Beach Chief Building Official (application: City building permit for demolition (LDC Sec. 4-10.A.1)).

Demolition permit steps in Cocoa Beach
Step 1
Determine whether the parcel is seaward of the FDEP Coastal Construction Control Line and get any FDEP permit or exemption first; LDC Sec. 4-10.D says all state permitting and licensing requirements must be approved before a city building permit.
Step 2
Apply through OpenGov with the application, fees, any required site plans or surveys, and copies of state and county permits (LDC Sec. 4-11.B).
Step 3
Do not start work until the permit is issued (LDC Sec. 4-11.A).
Step 4
The permit is complete only after final inspection and sign off by the CBO (LDC Sec. 4-13.B).
Documents Cocoa Beach asks for
| Document | What it is |
|---|---|
| Copies of state and county required permits or documentation | LDC Sec. 4-11.B [2] |
Utilities, asbestos, septic and trees in Cocoa Beach
The office that issues it
State rules apply on top of the local ones
The asbestos notice, septic and well abandonment, owner-builder limits and the Notice of Commencement come from state law. See the Florida rules that apply to every demolition.
Straight answers
Do I need a permit to demolish a house in Cocoa Beach?
Yes. Residential demolition in Cocoa Beach is permitted through the City of Cocoa Beach Chief Building Official.
Who can pull a demolition permit in Cocoa Beach?
The city says property owners are ultimately responsible for obtaining building permits.
Do I need an asbestos survey to demolish a house in Cocoa Beach?
No local asbestos program covers this county; FDEP Central District (main line 407-897-4100) receives the Notice of Renovation or Demolition (DEP Form 62-257.900(1), Notice of Demolition or Asbestos Renovation) at least 10 working days before the project start date for projects removing asbestos above the NESHAP thresholds. FDEP lists a $200 flat fee for hard copy or Pay Later notices and a $100 fee when paid through the DEP Business Portal Pay Now feature (effective March 23, 2025). FDEP says buildings meeting the residential exemption criteria in the Asbestos NESHAP are excluded from the work practice requirements; check 40 CFR Part 61 Subpart M for whether a given house qualifies.
Can Brightview handle the demolition in Cocoa Beach?
Yes. Brightview Homes (CRC1334100) pulls the permit under its Florida contractor license and runs the asbestos survey and notice, utility disconnects, historic documentation when it applies, tear-down, haul-off and final inspection. Demolition is quoted per job, typically $12,000 to $24,000.
Where this comes from
Every fact on this page comes from the official sources below, read on the date shown. Rules change; the building department has the final word.
- Cocoa Beach Building Division
https://www.cityofcocoabeach.com/136/Building - Cocoa Beach LDC Chapter IV, Article II (Ord. 1649, 2020)
https://cityofcocoabeach.com/DocumentCenter/View/6000/LDC---Chapter-IV--Article-II-Building-Permit-Application-Procedures - FDEP Frequently Asked Questions About the CCCL (updated April 2020)
https://floridadep.gov/sites/default/files/CCCL-FrequentlyAskedQuestions-2020.pdf - FDEP Asbestos program page (Central District coverage, 10 working day notice, fees)
https://floridadep.gov/air/permitting-compliance/content/asbestos - FDEP Onsite Sewage FAQ, Permitting (which counties DOH still permits)
https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting - DOH Brevard OSTDS Application Packet for Repair Permits and Abandonments (Rev 08/26)
https://brevard.floridahealth.gov/wp-content/uploads/sites/8/2025/04/repairs-and-tank-abandonments.pdf - FDEP Permitting of ENR-OSTDS, Indian River Lagoon Protection Program
https://floridadep.gov/water/onsite-sewage/content/permitting-enhanced-nutrient-reducing-onsite-sewage-treatment-and - https://cocoabeachfl.viewpointcloud.com/
https://cocoabeachfl.viewpointcloud.com/ - https://brevard.floridahealth.gov/wp-content/uploads/sites/8/2025/04/repairs-and-tank-abandonments.pdf ; https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting ; https://floridadep.gov/water/onsite-sewage/content/permitting-enhanced-nutrient-reducing-onsite-sewage-treatment-and
https://brevard.floridahealth.gov/wp-content/uploads/sites/8/2025/04/repairs-and-tank-abandonments.pdf ; https://floridadep.gov/water/onsite-sewage/content/onsite-sewage-faq-permitting ; https://floridadep.gov/water/onsite-sewage/content/permitting-enhanced-nutrient-reducing-onsite-sewage-treatment-and
What we could not confirm in published sources
Ask the building department about these before you plan around them.
- Whether demolition alone seaward of the CCCL requires an FDEP permit, an exemption determination, or nothing.
- Demolition permit fee (Service Fee Schedule not read) and demolition submittal checklist.
- Utility disconnect requirements (Cocoa water, Cocoa Beach Water Reclamation, FPL) before demolition.
- Whether Cocoa Beach has any local historic preservation program.
Get this scope quoted in Brevard County
Send the address or parcel ID. A real person replies within one business day with a written proposal. Nothing is ordered and nothing is charged until you approve it.
Prefer Spanish? Our team works with you in English or Spanish, from the county board to the permit counter.
- Residential Demolition
